Skip to main content

Electrical Vehicle (EV) Charging Cost Calculator

Use the calculator above for a quick electric car charging cost at home or on a public charger. Change the battery, charge level and tariff to see the cost per charge, per mile and per year. If you manage company cars or vans, open the fleet section to blend depot, home and public charging, compare with diesel and check site capacity.

Free calculator

EV charging cost calculator

kWh
mi/kWh
%
%
p/kWh
p/kWh
%

Use the rate from your tariff or latest bill. The calculator includes energy lost as heat while charging.

Fleet, depot and site capacity
Charging mix
Location
Rate
Share
Depot or workplace
p/kWh
%
Home
Rate above
%
Public charger
p/kWh
%
Public rapid
Rate above
%

Enter rates excluding VAT if your business reclaims it. Shares that do not total 100% are scaled automatically.

Annual use and diesel comparison
p/litre
mpg
Site capacity check
kVA
kVA

Both figures are on a half-hourly electricity bill. Highest demand is the maximum kVA the site has drawn in the last 12 months.

Cost per mile at home
7.3p

Home rate of 25.0p/kWh, including 10% charging losses

Energy drawn from the meter42.7 kWh
One 20 to 80% charge at home£10.67
Same charge on public rapid£33.71
Estimated charging time6.1 hours
Range added146 miles
Charging cost a year, per vehicle£731
Diesel equivalent a year£1,468
Saving a year vs diesel£737
Plan your EV chargers with PES

How much does it cost to charge an electric car in the UK?

The cost of a charge is the energy you put into the battery, plus the energy lost while charging, multiplied by the rate you pay per kWh. The cost per mile is the rate divided by how many miles the vehicle covers on each kWh.

Cost of a charge = battery kWh × share of battery charged ÷ (1 − losses) × rate
Cost per mile = rate ÷ miles per kWh ÷ (1 − losses)

Charging losses are the energy that turns into heat in the charger, cables and battery. On AC charging they are usually 8 to 15%, which is why the calculator adds 10% by default. Your meter or the public charger bills you for that energy too.

Worked example: a medium electric van

A van with a 75 kWh battery, charged from 20% to 80%, takes on 45 kWh. With 10% losses the charger delivers 50 kWh. At a depot rate of 26p/kWh that charge costs £13.00 and adds about 108 miles of range. The same charge on a public rapid charger at 79p/kWh costs £39.50.

At 2.4 miles per kWh the van costs 12.0p a mile on depot power. A diesel van doing 35 mpg with diesel at 155p a litre costs 20.1p a mile. Over 20,000 miles a year that gap is worth about £1,600 per van, before maintenance savings.

Where you charge decides what you pay

For a fleet, the biggest lever is the share of charging done at your own site. Public rapid charging can cost three times your contract unit rate, so a van that relies on it can end up costing more per mile than diesel. Moving that charging back to the depot is often worth more than any other change.

Where you charge Typical rate Medium van, per mile Medium car, per mile
Depot or workplace 26p/kWh 12.0p 7.6p
Home 25p/kWh 11.6p 7.3p
Public charger 52p/kWh 24.1p 15.2p
Public rapid 79p/kWh 36.6p 23.1p

Medium van at 2.4 miles per kWh, medium car at 3.8 miles per kWh, both with 10% charging losses.

Can your site take the chargers?

Every site has an agreed supply capacity in kVA. The headroom is that capacity minus the highest demand the site already draws. Chargers running at full power use up that headroom one for one, so a site with 50 kVA spare can run seven 7 kW chargers at full power before it goes over.

Going over your agreed capacity brings excess capacity charges on every bill. If the chargers you want do not fit, there are two routes: load management, which shares the available power between chargers, or a capacity increase from your network operator. Open the site check in the calculator to see where you stand, and use our kW to amps calculator to see the current each charger draws. If you are planning chargers, our team handles business EV charger installations from survey to commissioning.

Frequently asked questions

How much does it cost to charge an electric car?

A medium electric car with a 64 kWh battery costs about £10.67 to charge from 20% to 80% at a home rate of 25p/kWh, including 10% charging losses. The same charge on a public rapid charger at 79p/kWh costs about £33.71.

How much does it cost to charge an electric van?

A medium van with a 75 kWh battery costs about £13.00 to charge from 20% to 80% at a depot rate of 26p/kWh, including 10% charging losses. The same charge on a public rapid charger at 79p/kWh costs about £39.50.

What is the cost per mile of an electric car or van?

On depot power at 26p/kWh, a medium car doing 3.8 miles per kWh costs about 7.6p a mile and a medium van doing 2.4 miles per kWh costs about 12p a mile. A diesel van at 35 mpg with diesel at 155p a litre costs about 20p a mile.

How long does it take to charge an electric van?

Charging a 75 kWh van from 20% to 80% takes about 7 hours on a 7 kW charger, so it fits overnight. A 22 kW charger takes about 2.3 hours if the van’s on-board charger accepts 22 kW, and a 50 kW rapid charger takes about an hour.

Is it cheaper to charge at the depot or on public chargers?

The depot is almost always cheaper. A business contract rate is usually a third of the price of public rapid charging. The share of charging done on site is the biggest driver of a fleet’s running cost.

How many EV chargers can my site support?

Take your agreed supply capacity in kVA, subtract the highest demand your site already draws, and divide what is left by the charger size in kW. A site with 50 kVA of headroom can run seven 7 kW chargers at full power. Load management can fit more chargers into the same headroom.

Should I enter charging rates with or without VAT?

If your business reclaims VAT, enter rates excluding VAT so the comparison with diesel is like for like. If you cannot reclaim VAT, include it.

How do I lower my depot charging cost?

Your depot rate is set by your electricity contract. Charging overnight, when network charges are lower, and tendering the contract at the right point in the market both bring it down. PES can review your contract and tender it across the market.

Electrifying a fleet? We can check your site capacity, install the chargers and secure the right electricity contract for the extra load.

Talk to us